Port Authorities – Notice to Mariners

Port of Boston:

Notice 037.23 Barrier Testing
Notice 036.23 Barrier Testing Cancelled
Notice 035.23 Barrier Testing
Notice 033.23 Flood Barrier Works
Notice 032.23 Barrier Emergency Closure Monday 2nd October AM
Notice 031.23 Barrier Emergency Closure Confirmation
Notice 030.23 Barrier Emergency Closure
Notice 028.23 Barrier Testing
Notice 027.23 Flood Barrier Works
Notice 026.23 Barrier Emergency Closure Cancelled
Notice 025.23 Barrier Emergency Closure
Notice 024.23 Flood Barrier Works
Notice 023.23 Bathy Survey Operations
Notice 011.23 Humber Guardian River Survey Works
Notice 009.23 Barrier Survey
Notice 005.23 Barrier Testing
Notice 003.23 Barrier Testing
Notice 001.23 Barrier Testing
Notice 055.22 Barrier Testing
Notice 052.22 Sir William River Survey Works

Notice 051.22 Barrier Testing
Notice 049.22 Barrier Testing
Notice 043.22 Barrier Testing
Notice 035.22 Bathy Survey Operations
Notice 033.22 Barrier Testing
Notice 032.22 Bathy Survey Operations
Notice 031.22 Bathy Survey Operations
Notice 030.22 Barrier Testing
Notice 026.22 Bathy Survey Operations
Notice 024.22 Barrier Testing
Notice 022.22 Bathy Survey Operations
Notice 019A.22 Bathy Survey Operations
Notice 019.22 Bathy Survey Operations
Notice 016.22 Barrier Testing
Notice 015.22 Bathy Survey Operations
Notice 014.22 Bathy Survey Operations
Notice 012.22 Bathy Survey Operations
Notice 011.22 Barrier Testing
Notice 010.22 Dredging Works
Notice 009.22 Bathy Survey Operations
Notice 008.22 Bathy Survey Operations
Notice 007.22 Dredging Works
Notice 006.22 Bathy Survey Operations
Notice 005.22 Dredging Works
HOW02_OFF_EX NtM Export Cable Installation Works (06239336_Y)
Notice 003.22 Bathy Survey Operations
Notice 002.22 Bathy Survey Operations
2022 Standing Notice to Mariners
Notice 079.21 Barrier Testing
Notice 078.21 Bathy Survey Operations
011221 – FINAL – Christmas Newsletter
Notice 076.21 Bathy Survey Operations
Notice 075.21 Barrier Testing
Notice 074.21 Bathy Survey Operations
Notice 072.21 Barrier Testing
Notice 071.21 Bathy Survey Operations
Notice 069.21 Barrier closure- tide surge
Notice 068.21 Bathy Survey Operations
Notice 067.21 Swinging Dolphin Repairs
Notice 065.21 Temporary Aids to Navigation – Lights
Notice 061.21 Bathy Survey Operations
Notice 060.21 Bathy Survey Operations
Notice 059.21 Humber Guardian River Survey Works
Notice 058.21 Bathy Survey Operations
Notice 057.21 Barrier Matrix Signs
Notice 056.21 Bathy Survey Operations
Notice 055.21 Barrier Testing
Notice 048.21 Riverside Quay Diving Operations
Notice 045.21 Bathy Survey Operations
Notice 044.21 Riverside Quay Diving Operations
Notice 042.21 Riverside Quay Diving Operations
Notice 043.21 Bathy Survey Operations
Notice 040.21 Dredging Works
Notice 041.21 Riverside Quay Diving Works Prelim
Notice 041.21 Riverside Quay Diving Works Prelim
Notice 036.21 Wet Dock Closure
Notice 035.21 Bathy Survey Operations
20210614_BB FINAL Newsletter GT ZC_SL edit
Notice 028.21 Bathy Survey Operations
Notice 030.21 Dredging Operations
Notice 029.21 Barrier Testing
Notice 024.21 Bathy Survey Operations
Notice 023.21 Jack Up Barge & Dredging Operations
Notice 022.21 Jack Up Barge
Notice 018.21 Barrier Testing
Notice 016.21 Bathy Survey Operations
Notice 015.21 Jack Up Barge
Notice 014.21 Dredging
Notice 013.21 Barrier Testing
Notice 011.21 Humber Guardian River Survey Works
Notice 013.21 Barrier Testing
Notice 012.21 Barrier Testing
Notice 004.21 Water Injection Dredging
Notice 004.21 Water Injection Dredging
Notice 001.21 Barrier Testing
Notice 069.20 Swinging hole dredging
Notice 066.20 River Survey Works
Notice 064.20 Barrier Testing
Notice 065.20 Swinging hole dredging
Notice 062.20 Barrier Testing
FINAL – Newsletter Sept 2020 – 280820
FINAL – Newsletter Sept 2020 – 280820
Notice 057A.20 River Survey Works
Notice 057.20 River Survey Works
Notice 056.20 Swinging hole dredging

 

Port of Wisbech Authority:

001-24 LNTM Remaing in Force 2024
002-23 Cross Keys Bridge Bird Netting cancelled
002-23 Cross Keys Bridge Bird Netting
001-23 LNTM Remaing in Force 2023
004-22 Buoy Moves
010-21 Buoy Moves
005-21 Tide Gauge inspection
004 – 21 Holbeach Range DZ 10
003-21 Buoy Moves
LNTM 009-20 Buoy Moves
LNTM 008-20 Buoy Moves

 

King’s Lynn Conservancy Board:

012024 Notice to Mariners in Force 2024
NtM 26 2023 Beacon B re-established
NtM 25 2023 W1 off station
NtM 24 2023 New Contact email
NtM 23 2023 W2 re-established
NtM 21 2023 Bravo Buoy
NtM 20 2023 Beacon B collapse
NtM 19 2023 W2 missing
162023 Wet Dock Flushing
152023 Vessel Reporting in Kings Lynn
142023 2024 Kings Lynn Fisher Fleet Flushing
132023 Kings Lynn Dredging
122023 Kings Lynn Plough Dredging
112023 Dredging Kings Lynn Docks
102023 3rd Fisher Fleet Flush September 2023
092023 King’s Lynn Docks Surveying
082023 2nd Fisher Fleet Flush September 2023
072023 King’s Lynn Dredging
062023 Fishing Fleet Flush
052023 King’s Lynn Dredging
NtM 13 2023 Hanseatic Water ski Race 2023
NtM 12 2023 no. 17 buoy move
Notice 008.23 Barrier Testing
NtM 09.23 Jamie D Underwater Operations, Gt Ouse, A47 Bridge
NtM 08 2023 buoy moves Nos. 13-19
NtM 07 2023 Min allowances on draught
NtM 23 2022 Bed levelling Dock Point
202213 – KLN NTM -Dock opening Limitations
202212-KLN Dredging
202211 – KLN NTM Fisher Fleet Flushing
202210 – KLN NTM Dredging and surveys
NtM 18.22 Hunstanton Waterski Event
202207 Cherry Sand Dredging of King’s Lynn NtN
202206 KLN NTM Surveys
202205 – KLN NTM Fisher Fleet Flushing
NtM 11 2022 No.13 buoy move
202204 Plough Dredging King’s Lynn
NtM 09 2022 Roaring Middle
NtM 07 2022 Changes to buoyage No. 24
NtM 6 2022 Change of Appraoch Channel
202120 Plough Dredging and Survey
NtM 32 2021 Chnges to Buoyage
202118 KLN NtoM Dredging
NtM 31 2021 NW spoil buoy
NtM 30 2021 Bravo Buoy move
NtM 28 2021 Roaring Middle
NtM 2125 survey Ops Noortruck ROW
NtM 2126 survey Ops Noortruck LINCS WF
NtM 27 2021 Buoy B
202115 KLN NotM Dredging
NtM 23 2021 Hunstanton Water ski Race 2021
NtM 22 2021 Changes to buoyage
NtM 20 2021 Hanseatic Water ski Race 2021
NtM 2119 survey Ops Morven ROW01
NtM 18.21 A47 Bridge Inspections
NtM 15 2021 Changes to buoyage
NtM 16 2021 Foul ground
NtM 14 2021 East Stones Buoy
NtM 12 2021 Cancel Viking Link
NtM 13 2021 Foul ground
NtM 11 2021 East Stones Buoy
NtM 10 2021 Changes to buoyage
Ntm 0921 Islington Pumping Station pontoon ops
NtM 08 2021 Changes to buoyage
202105 KLN NotM Flushing Fleet March 2021
202106 KLN Dredging
202102 Shore Leave Covid 19
202103 KLN NtoM Works
202102 KLN NtoM Dredging
202101 Mooring operations
202101 NtoM KLN Flushing Fleet Jan 2021
Ntm 2620 Islington Pumping Station part 2
NTM 25 of 2020 Transmission cable exposure Race Bank WF
NtM 24 2020 Changes to buoyage

 

Wells Dredging Operations:

10.3.22 Notice to Mariners 009-22
4.3.22 Notice to Mariners 008-22
18.02.22 Notice to Mariners 006-22
11.02.22 Notice to Mariners 005-22
3.02.22 Notice to Mariners 004-22
27.1.22 Notice to Mariners 003-22
21.1.22 Notice to Mariners 002-22
14.1.22 Notice to Mariners 001-22
9.12.21 Notice to Mariners 030-21
1.12.21 Notice to Mariners 029-21
30.11.21 Notice to Mariners 028-21
18.11.21 Notice to Mariners 027-21
Notice 075.21 Barrier Testing
11.11.21 Notice to Mariners 026-21
5.11.21 Notice to Mariners 025-21
29.10.21 Notice to Mariners 024-21
9.9.21 Notice to Mariners 023-21
02.09.21 Notice to Mariners 022-21
30.8.21 Notice to Mariners 021-21
19.08.21 Notice to Mariners 020-21
15.07.21 Notice to Mariners 019-21
11.6.21 Notice to Mariners 018-21
7.5.21 Notice to Mariners 017-21
29.4.21 Notice to Mariners 016-21
29.4.21 Notice to Mariners 016-21
22.4.21 Notice to Mariners 015-21
19.3.21 Notice to Mariners 014-21
8.4.21 Notice to Mariners 013-21
25.3.21 Notice to Mariners 012-21
18.3.21 Notice to Mariners 011-21
4.3.21 Notice to Mariners 009-21
25.2.21 Notice to Mariners 008-21
19.02.21 Notice to Mariners 007-21
11.2.21 Notice to Mariners 006-21
5.2.21 Notice to Mariners 005-21
29.01.21 Notice to Mariners 004-21
21.01.21 Notice to Mariners 003-21
08.01.21 Notice to Mariners 001-21
08.12.20 Notice to Mariners 0018-20
10.12.20 Notice to Mariners 0019-20
3.12.20 Notice to Mariners 0017-20
26.11.20 Notice to Mariners 0016-20
19.11.20 Notice to Mariners 0015-20
5.11.20 Notice to Mariners 0013-20
29.10.20 Notice to Mariners 0012-20
22.10.20 Notice to Mariners 0011-20
16.10.20 Notice to Mariners 0010-20
9.10.20 Notice to Mariners 0009-20
1.10.20 Notice to Mariners 0008-20
24.09.20 Notice to Mariners 0007-20
17.09.20 Notice to Mariners 0006-20
10.09.20 Notice to Mariners 0005-20
04.09.20 Notice to Mariners
20.8.20 Notice to Mariners Port of Wells

Notice to Mariners new buoy 000320 – Wells

Lowestoft

202228 – Berth Depths
202227- Ipswich Tidal Barrier Tests
NtM Scylla Main Lay_Rock Berms
Scylla As-Laid RPL 08092021
NtM Scylla PLSE and Install_Lowestoft_v3_PLSE
NtM Scylla_Gassco Crossing
NtM Scylla_Wintershall Crossing
NtM Scylla_Tulip Oil Xing
NtM Scylla PLSE and Install_Lowestoft_v2
NtM Scylla PLSE and Install_Lowestoft_v1
NtM Scylla PLSE and Install_Lowestoft

Wave Buoys

Blakeney February 2022
Northwell February 2022
Dowsing WR NtM Poster
Chapel Point January 2022
Blakeney January 2022
Poster NtoM Sizewell Sept 2021 exp Mar2023
02 September 2021 Northwell
Cefas North Sea Wave Glider – N to M Aug 2021
Felixstowe wave buoy August 2021
Blakeney May 2021
Chapel Point May 2021
Lowestoft February 2021
North Well February 2021
Happisburgh February 2021
Felixstowe February 2021
Blakeney November 2020
Chapel Point November 2020

Other

Notice to Mariners No 1-2022 draft
Notice to Mariners No 14-2022 – Saltfleet to Gibraltar Point Beach management Works
022022a Updated information for Leisure vessels arriving from outside the UK (1)
North Well August 2022
Chapel Point August 2022
Blakeney August 2022
Notice to Mariners No 6-2022 – Saltfleet to Gibraltar Point Beach Management Works
Notice to Mariners No 5-2022 –  Saltfleet to Gibraltar Point Beach Management Works
Notice to Mariners No 4-2022 – Saltfleet to Gibraltar Point Beach Management Works
006-22 Buoy Moves
Notice to Mariners No 1-2022
202203 Cherry Sand Dredging of King’s Lynn NtN (1)
202202 Leisure vessels arriving from outside the UK
005-22 Swing Bridge Painting worksv3
202201 EA NtoM Sanctions on Russian vessels
005-22 Swing Bridge Painting worksv2
C End 18 – 2021 Sediment Coring N to M Poster
OSV Noortruck – A-2-Sea – Notice to Mariners – Lincs Cable Route Survey (2021-08-27)
UK_NTM_Shell_API_Relume_20210805_MG
NTM havila Subsea Shell UK
P1836-NTM-02-Notice to Mariners-Morven-AODA iRGMP
Harbour Energy Ltd – LOGGS Platform Removal NTM – 002.2021
Harbour Energy Ltd – LOGGS Platform Removal NTM – 001.2021
007-21 Buoy Moves
Notice to Mariners No 9-2021
Notice to Mariners No 6-2021 final (002) – Saltfleet – Gibraltar Point Beach Management Works
Notice to Mariners No 5-2021 final – Saltfleet – Gibraltar Point Beach Management Works
Notice to Mariners No 4-2021 final – Saltfleet – Gibraltar Point Beach Management Works
Notice to Mariners No 3-2021 final – Saltfleet – Gibraltar Point Beach Management Works
202109 KLN NtoM Dredging – Dredging of Riverside Quay and King’s Lynn Dock
NtM – EGS Pioneer April 2021 – Bathymetric Survey
Eastern Link – NEXT Marine Survey – NtM
Notice to Mariners No 1-2021 final  – Saltfleet – Gibraltar Point Beach Management Works

 

design sprint agency